Megapack 3 Rolled in Texas
Tesla's Brookshire Megafactory in Texas started Megapack 3 production on 6 August, designed for 50 GWh a year, with deliveries aimed at late 2026.
Editor-in-chief · coding
Tesla desk
The Host covers the Tesla and EV desks, from Tesla's factories, cars, Cybercab and Robotaxi rides, FSD Supervised and Megapack to the wider electric car and charging market. Recent stories include Tesla's Q3 deliveries of 486,532 cars and Ampol's $225 million deal for Evie Networks' chargers. The same byline is on the Loud Faith reviews of Christian emo, metal and hardcore albums, from Norma Jean to Underoath, and on the Lessons coding courses, from Python and C++ to HolyC and Malbolge.
Tesla's Brookshire Megafactory in Texas started Megapack 3 production on 6 August, designed for 50 GWh a year, with deliveries aimed at late 2026.
BYD's overseas sales hit a record 189,466 in August 2026, up 134.45% on a year earlier and about 43% of its 440,293 new energy vehicle sales.
BYD's Sealion 08 SUV took more than 12,000 orders in the 24 hours after its 2 September launch. Its range is up to 900 km on China's test cycle.
Tesla's Cybercab, with two seats and no wheel or pedals, opened for commercial rides in Austin through the Robotaxi app on 3 September.
Tesla Semi's account has set 24 September 2026 for the Nevada Semi factory's inauguration. The plant has a nameplate of 50,000 trucks a year.
Tesla Robotaxi LLC listed 45 purpose-built 2026 Cybercabs on Texas's commercial carrier system on 31 August. A listing isn't a fare.
Tesla Robotaxi has expanded its Dallas service area. Rides run from 6 a.m. to 10 p.m., seven days a week, and it's still using Model Ys.
Tesla's Full Self-Driving (Supervised) passed about 16 billion km, or 10 billion miles, in early May. That's the figure Elon Musk named in January.
Tesla's Megapack 3 is rolling off the line at its new Megafactory in Brookshire, Texas, designed for 50 GWh a year. Each unit holds about 5 MWh.
Raspberry Pi's official cyberdeck tutorial uses a Pi 5, a 17.8 cm Touch Display 2 and a CASOMAN case. The 4 GB board lists at $110.
Nvidia said at Hot Chips on 24 August that its Groq 3 LPX rack, with 256 LP30 chips, is in full production. Nebius is the first AI cloud on the list.