A 220-tonne crane has been lifting concrete beams nearly twice the length of a cricket pitch over the South Eastern Freeway at Mount Barker. The last of the 12 beams for the new Mount Barker interchange bridge is going in, and the government says the upgrade will open to traffic in late 2027.

Image: supplied, via InDaily, still from drone video, resized.